Monthly Archives: September 2017

We have just completed an install at the Gingin Observatory. A 100mm bore was drilled and a pump installed for use on the new fire protection system that has been…
We have just completed an install at the Gingin Observatory. A 100mm bore was drilled and a pump installed for use on the new fire protection system that has been…