Testing out Aqua Attacks new toy on a 200mm bore in Gnangara… Mudslayer 500 hard at work
Latest News
New bore for at “Glencoe” for the Generation Pastrol Co.
Another successful 200mm bore drilled for LD Total at the sports field in Wandi. The bore was drilled to 38m and a 12m stainless steel screen was installed. Production pump…
Here at Aqua we dont just do drilling and submersible pumps we also maintain pump stations in some of Perths tallest buildings. Check out this view from the top of…
We have just completed an install at the Gingin Observatory. A 100mm bore was drilled and a pump installed for use on the new fire protection system that has been…
The last few weeks we have been busy drilling 5 monitering bores and test pumping them for a new development in Baldivis.
This week we have just completed a new 200mm bore in Baldivis. Bore was drilled to 20m with 6m stainless steel screen. Test pumped at 6 litres/sec with a total…
Banksia Grove Bore Another successful bore in Banksia Grove. 55m deep 200mm 12m stainless steel screens Test pumping at the moment at 12L/sec. Good start to 2017 !!!
Last weekend we were drilling on a farm just south of Ledge Point. Not a bad view for the day!