This week we are test pumping a new bore we have been drilling for the past 2 weeks in beermullah. Construction of a 60m 200mm bore was required to run a new center pivot irrigation system. The bore was drilled into the leederville aquifer and cement grouted to surface. Currently we are test pumping at 20L/sec.